On-site communication and cross-checking The company organizes a "big consultation" on production safety"
Release time:
2022-06-21
News from our newspaper 6# February 14 and 15 , the safety production supervisors of the group company and its subordinate enterprises gathered in Huang Ping Jianfeng Cement Company to exchange the three-year work of safety risk control and on-site management, and went to front-line positions such as Huang Ping Jianfeng production line and mine to find out potential safety hazards, spot check the safety knowledge learning of employees, and conduct on-site scoring. Since the three-year action work of safety risk management and control and on-site governance has been carried out in an all-round way, all subordinate units of the company have promoted safety risk management and on-site governance in an orderly and in-depth manner according to the nature and characteristics of their respective work. At the safety production work exchange meeting held on November 12, 14, 13, , 6, the safety production supervisors of enterprises such as Huang ping peak, daye peak, Yunnan peak, pharmaceutical company production department, Anhui new north card, Anhui peak north card, international trade, peak cable, peak health, etc. successively carried out three-year actions on safety risk control and on-site management, reported and shared their work results, exchanged experiences, and analyzed gains and losses, it also introduces the development of the company's implementation of the safety production responsibility system, the implementation of safety production laws and regulations, and standard procedures, safety risk control and hidden danger investigation and management, emergency management, education and training content, etc., and summarizes experience and lessons, and looks for advanced counterparts. Gaps and deficiencies in enterprises and brother enterprises. At the
meeting, the overall situation of the company-wide industrial accidents in the first half of 2022 was also reported. The two more serious accidents were mainly analyzed, the causes were analyzed, the lessons were summarized in combination with the characteristics of the accidents, and all enterprises were required to strengthen basic management and continuously improve the construction of safety risk management and control system. In his concluding speech at the meeting, Chen Tianci, chairman of the supervisory board of
Group Company, affirmed the achievements made by various units in carrying out on-site governance for three years and risk prevention and control, and praised Huang Ping Jianfeng for his obvious progress in on-site governance. He also put forward six requirements for the company's work safety, namely: all units should timely and conscientiously summarize the work experience of safety risk prevention and control, strengthen the work exchange and experience sharing between enterprises, strengthen mutual learning and reference, and achieve the effect of common progress; All units should learn from the safety accidents in the first half of the year, further improve the risk assessment and control mechanism, and strive to ensure that no safety accidents occur in the second half of the year; further promote the safety risk management and control work, continuously improve the assessment methods and implementation rules according to the requirements of relevant documents of the group company, continuously improve the risk awareness, identification and control level of employees, grasp the results, and truly realize the work requirements of risk management and control management; To achieve the application of"typical illegal operation behavior 50 " education, and to pay close attention to practical application on the basis of previous training and assessment, so as to not only memorize, it can also avoid and correct illegal operations and eliminate potential safety hazards in actual work. In terms of the promotion of the three-year on-site governance action, all units should keep pace with the times while implementing the plan and striving to complete it ahead of schedule. According to the current technical development level and the needs of the situation, timely adjust or increase the rectification projects; continuously improve the professional quality of safety management personnel and strengthen professional learning, it is required that all enterprise safety supervisors must obtain the qualification of registered safety engineer before the end of 2023
, and the leaders in charge of enterprises are encouraged to obtain the qualification certificate of registered safety engineer. After themeeting, the inspection team went to Huangping Jianfeng factory and mining area to carry out a large-scale inspection of safety production from workshop to workshop, from post to post and from link to link. The inspection team checked the equipment and facilities such as ammonia tank area, grate cooler, machine repair, warehouse, raw material roller press, etc., the risk control measures and personal protection in the delivery area and maintenance site, and "consultation to check the pulse" to sort out the hidden safety hazards, huang Ping Jianfeng is required to carefully analyze the causes of potential safety hazards, carry out rectification within a time limit, follow up and supervise until the hidden hazards are eliminated, form closed-loop management, and continuously improve the risk prevention and control system, so as to truly make safety accidents "impossible". On 15 , the participants went into workshops and departments in groups to conduct spot checks and inspections on the on-site management and risk control management of Huang Ping's peak work, and scored on the spot. According to the requirements of the company's safety risk prevention and control superior enterprise appraisal, on-site random sampling and random questions were asked. Through the examination of front-line employees' answers and relevant documents, the scores were scored against the
11items of the scoring standard. This is also the first corporate cross-check organized by the group company.
Through experience exchange and cross-examination, the safety production supervisors attending the meeting unanimously said that this form of special discussion and cross-examination enables everyone to learn good methods and experiences of brother enterprises, be practical and emphasize practical results, and hope to be organized regularly.It is understood that starting from 16 , the inspection team also successively went to Yunnan Jianfeng, Daye Jianfeng and other units to carry out safety inspections until the inspection and assessment of the production and business units of the whole group were completed. (Song Shijie)
More information
In the eastern corner of the production area of Jianfeng Health Technology Company, there is a very inconspicuous building. From below, only a few pipes of uneven thickness can be seen on the top and the slogan "Focus on Environmental Protection and Promote Sustainable Development" with red letters on the yellow background on the stainless steel guardrail. Walking up, you can only see several closed pools and a small room with stacks of documents, test tubes, glass bottles and other testing tools on the table. This is the peak and healthy sewage treatment station. The production sewage of the whole factory area is concentrated here. After adjustment (PH adjustment), pre-acidification, anaerobic, anoxic, aerobic (aeration), precipitation and other links, it is discharged into the pipe network after reaching the special discharge standard. Yin Zhiwu, executive deputy general manager of Jianfeng Health, said that because the sewage treatment station in Wucheng District has not yet been built, Jianfeng Health has not yet been able to achieve pipe discharge, and the relevant national laws have strict requirements on the discharge of water pollutants from the extraction pharmaceutical industry. Sewage discharge must reach a special discharge limit, that is, chemical oxygen demand (COD) must be less than 50 mg/L. Enterprise development and environmental protection are both the concept of peak health since its establishment. In March this year, on the basis of the original environmental protection facilities, Jianfeng Health carried out technical renovation of waste gas collection and treatment facilities, and at the same time installed a sealing cover on the sewage treatment station to realize the closed collection of waste gas. Since the trial operation of this facility in mid-May, the overall effect has been obvious. The original treatment tank would emit an unpleasant smell during work, but now the smell has been significantly reduced. Compared with the young enterprise of peak health, the relatively "older" peak pharmaceutical has more experience in sewage treatment and environmental protection. Akihama
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-30
Jianfeng Pharmaceutical Won Advanced Collective of Municipal Red Cross Humanitarian Promotion Award
On April 24, the Red Cross Society of Jinhua issued a circular commending the advanced units and individuals of the 2016 Red Cross Humanitarian Promotion Award. Peak Pharmaceutical Company won the Red Cross Humanitarian Promotion Award for Advanced Collective. The Red Cross is a social relief organization engaged in humanitarian work, with the purpose of carrying forward the spirit of humanity, fraternity and dedication, protecting human life and health, and promoting the cause of peace and progress of mankind. As a socially responsible enterprise, Jianfeng Pharmaceutical has always attached importance to public welfare and charity work, vigorously promoted the spirit of the Red Cross, and vigorously supported the work of the Red Cross with practical actions. In September 2016, at the theme publicity activity of "World First Aid Day" and the opening ceremony of the municipal Red Cross emergency rescue station (point), Huang Jinlong, deputy general manager of the group company and general manager of the pharmaceutical company, donated 6 AEDs known as "life-saving artifact" to the Red Cross on behalf of Jianfeng Pharmaceutical, it is equipped with six Red Cross emergency rescue service stations (points), namely, Jinhua high-speed railway station, sports center, cultural center, Shuanglong scenic spot, Siping village scenic spot and Suoyuan village scenic spot. The configuration of AED equipment has played a very good role in improving the emergency rescue capacity of Jinhua's key locations, and has been affirmed by the Red Cross and related units. (Spike Pharmaceuticals)
2020
07-31
Jingmai Airport Test Flight Successfully Runway Cement Spike Manufacturing
On April 7, a Boeing 737-700 aircraft of China Eastern Airlines Yunnan took off from Kunming. After completing two flight test subjects, it landed safely at Lancang Jingmai Airport. This not only marked the basic completion of the airport flight area, The official start of the test flight also marked that the "Peak" brand airport runway cement passed the first "final exam". Lancang Jingmai Airport is a major project with milestone significance in the history of Pu'er transportation construction. Since then, an air corridor connecting southwest Yunnan and Southeast Asia has been added between Kunming and Pu'er, which will greatly promote the development and utilization of tourism resources in Lancang, Menglian and Ximeng "Pu'er Green Triangle" area, and promote the sustainable development of local economy and society; it is of great significance to strengthen the city's national defense construction, maintain border stability, promote national unity, improve emergency rescue capabilities, and promote Pu'er's integration into the country's "Belt and Road" construction. Since the start of the construction of the airport, Yunnan Jianfeng has been paying close attention to it, organizing technical research and repeated tests, and finally produced high-quality airport runway special cement, and with excellent product quality, superior product performance and high-quality service, it has become a runway for Lancang Airport. Cement manufacturer. This not only fills the gap of "peak" airport special cement, but also is of great significance to promote the "peak" brand and improve the market influence of enterprises. It is understood that Jingmai Airport is initially confirmed to be officially opened to traffic at the end of May. (Li Liangping)
2020
07-31