I'm on the spike for thirty years
Release time:
2020-08-14
I stepped onto the stage as a representative of the old employee who served the peak for more than
years to receive souvenirs from the leaders of the group company at the peak 30 years 11 3 and the peak entrepreneurship 60 anniversary party. At that moment, my excitement was hard to express, and I also remembered the little things since I entered the peak.
I remember that it was 1988 8 28 . I stepped into the peak with excitement. After a week of training, I was assigned to the raw material workshop to fight back and break as a crushing worker. At that time, in the vertical kiln cement plant, because there was no large crusher, the particle size of limestone entering the crusher could not be greater than 30 cm, and those larger than the requirements must be crushed by the conveyor chain plate machine, thus having our type of work. Due to inexperience, after a shift, my two calves were full of wounds pierced and marked by splashed stone debris, and there was blood everywhere. It was miserable. Fortunately, under the careful guidance of the old master, after a few days of training and mastering the skills, the work will save more effort and less injuries.
Six months later, my efforts were recognized by the workshop management and I was transferred to the workshop maintenance team as a repairman. Under the leadership of the masters, I quickly mastered some basic knowledge of equipment maintenance, and was assigned to be a maintenance worker on duty in less than three months. At that time, there was a lot of equipment renovation and upgrading work in the factory, and the gold mud factory was preparing to apply for a national secondary enterprise. perhaps because of a certain understanding and previous carpentry work, the spare parts I made were more practical and beautiful than those made by others, so the workshop adjusted my work, mainly making spare parts and on-site renovation, to control running, running, dripping and leaking. According to the backward production technology at that time, we were able to clean up the workshop floor with mops and verify the equipment hygiene inspection with white gloves. The efforts we made can be imagined. It is also with the concerted efforts of all the staff that we have achieved very good results.
In January of 1990 , I was transferred to the Group's mechanical and electrical power plant to learn sheet metal technology from my master. That was the period of vigorous development after the formation of the group. The workload of plate making was very large, and it was also the best time for our young people to learn technology. Every day, I did a good job of lofting and marking, and went to rob the cutting gun and electric welding pliers, "forcing" the electric welder to teach me gas cutting and electric welding-due to the relatively fine division of labor at that time, the sheet metal worker was responsible for lofting, marking and patching. gas cutting and welding were all the work of the electric welder, and everyone's code had to be typed after the workpiece was completed and accepted. if the quality of gas cutting and welding was poor, the electric welder. In this way, after ten years of hard work, my technical level and organizational ability have been improved and recognized by my colleagues. 2001
1 , I became deputy director of the mechanical and electrical workshop. This is not only a change of position, but also a change of function. In the past, you only need to do it yourself. When you become a deputy director, you not only need to be able to do it yourself, but also lead the workshop staff to work hard, improve the overall skill level, and improve the maintenance. Quality and work efficiency. In those years, the technical transformation, maintenance, and repair of the old and waste in the mechanical and electrical workshop were carried out vividly and won a lot of praise. With the development of the peak, we have also got more and more room for development.
5 April 8 , I walked out of Jinhua with uneasy feelings and reported to Fuyang Jianfeng Dengcheng Cement Co., Ltd., the first stop of the peak "out of Jinhua to run cement", where there was our first new dry rotary kiln production line of the peak. When I came to a strange working environment, came into contact with a strange production process, and saw such a large equipment for the first time, I was a little shocked and soberly realized that I had to learn again. According to the work arrangement, I was initially responsible for the management of the mechanics. During that time, I followed the technicians of the equipment manufacturer to debug the machine every day, constantly learning and groping, and the concept of equipment management completely changed. In a few years, I have grown from a mechanic supervisor to an equipment engineer. The equipment management level of the enterprise is getting higher and higher. The effective operation rate and the control level of machine material consumption are in the forefront of peer enterprises.
2015
1 , I went out of Zhejiang and came to Yunnan Jianfeng Cement Co., Ltd. to take on the equipment preservation work of the whole enterprise. This is a new challenge for me. It happens that the enterprise is adjusting its management mode, from full participation in equipment management to security personnel responsible for equipment operation, maintenance, inspection and management. My work content has increased and my responsibilities have become heavier. To this end, I started from the aspects of working plan formulation, strengthening equipment inspection, carrying out predictive maintenance, training staff skills, improving maintenance quality, etc., and worked together with my colleagues, and the operation rate of the main engine increased year by year. I changed many positions and made some achievements in the peak
years, but what makes me more happy is my personal progress in this process. He entered the factory in 1988 , completed the Senior high school study of night school in 1992 , passed the senior worker in 1998 , was appraised as a technician in 2000 , obtained the junior college diploma in 2003 , was appraised as a senior technician in 2007 , and obtained the qualification of equipment engineer in 2009 , step by step, I grew up with the spikes. Here, I would like to sincerely thank the peak to give the platform, so that I can witness their growth, fully display their talents. In the days to come, I will work with my colleagues to make continuous efforts for the grand goal of "one hundred years peak! (Lou Xuxin)
More information
Company fully deploys 2019 work
On January 28, the group company held a business analysis meeting to review and summarize the work situation in 2018, arrange and deploy the work for the new year, and put forward work requirements. At the meeting, various professional companies and directly affiliated enterprises made reports on the overall work situation in 2018, focusing on analyzing the existing problems and deficiencies, and proposing corresponding solutions and work plans for 2019. Xiang Chongping, deputy general manager of the group company, made a systematic review of the current human resources efficiency and human resources development of the company. Chen Tianci, chairman of the board of supervisors, made a report and analysis on the internal control, safety and environmental protection work in 2018. Lan Xiaolong, head of finance, analyzed the risks and challenges currently faced by the company according to the operating data and financial situation of its subordinate enterprises. The functional departments and offices of the headquarters also made a brief report on their annual work. Yu Jianhong, general manager of the group company, made a comprehensive review of the company's operation in 2018 and made a comparative analysis of the main economic indicators of each industrial sector. In 2018, the operating indicators of the company's various industrial sectors have improved significantly year-on-year, and the group company has also created the best operating performance in history. All units have completed the formulation of the second round of "three-year business plan", which points out the direction for the next three years of business work; the group company has also completed the first draft of the new "five-year strategic development plan", which is being revised and enriched. In addition, the two main businesses have also made substantial progress in investment expansion and industrial integration around strategic objectives, and the operating costs of major enterprises have decreased to varying degrees; the optimization of organizational structure and post setting has achieved new results, and management efficiency and people
2020
07-22
Company fully deploys 2019 work
On January 28, the group company held a business analysis meeting to review and summarize the work situation in 2018, arrange and deploy the work for the new year, and put forward work requirements. At the meeting, various professional companies and directly affiliated enterprises made reports on the overall work situation in 2018, focusing on analyzing the existing problems and deficiencies, and proposing corresponding solutions and work plans for 2019. Xiang Chongping, deputy general manager of the group company, made a systematic review of the current human resources efficiency and human resources development of the company. Chen Tianci, chairman of the board of supervisors, made a report and analysis on the internal control, safety and environmental protection work in 2018. Lan Xiaolong, head of finance, analyzed the risks and challenges currently faced by the company according to the operating data and financial situation of its subordinate enterprises. The functional departments and offices of the headquarters also made a brief report on their annual work. Yu Jianhong, general manager of the group company, made a comprehensive review of the company's operation in 2018 and made a comparative analysis of the main economic indicators of each industrial sector. In 2018, the operating indicators of the company's various industrial sectors have improved significantly year-on-year, and the group company has also created the best operating performance in history. All units have completed the formulation of the second round of "three-year business plan", which points out the direction for the next three years of business work; the group company has also completed the first draft of the new "five-year strategic development plan", which is being revised and enriched. In addition, the two main businesses have also made substantial progress in investment expansion and industrial integration around strategic objectives, and the operating costs of major enterprises have decreased to varying degrees; the optimization of organizational structure and post setting has achieved new results, and management efficiency and people
2020
07-31
The truth about private equity investments you need to know.
China Securities Regulatory Commission Zhejiang Regulatory Bureau and China Securities Investor Protection Fund Co., Ltd. jointly launched the "those private equity fund investment truth you need to know" investment education products. With the outbreak of private equity investment, the proportion of individual investors has further increased, and there are more and more "rich myth" scams. But the things behind "private placement" may not be as simple as you think, and risk prevention knowledge needs to be known early.
2020
07-31
The truth about private equity investments you need to know.
China Securities Regulatory Commission Zhejiang Regulatory Bureau and China Securities Investor Protection Fund Co., Ltd. jointly launched the "those private equity fund investment truth you need to know" investment education products. With the outbreak of private equity investment, the proportion of individual investors has further increased, and there are more and more "rich myth" scams. But the things behind "private placement" may not be as simple as you think, and risk prevention knowledge needs to be known early.
2020
07-30
The truth about private equity investments you need to know.
China Securities Regulatory Commission Zhejiang Regulatory Bureau and China Securities Investor Protection Fund Co., Ltd. jointly launched the "those private equity fund investment truth you need to know" investment education products. With the outbreak of private equity investment, the proportion of individual investors has further increased, and there are more and more "rich myth" scams. But the things behind "private placement" may not be as simple as you think, and risk prevention knowledge needs to be known early.
2020
07-31
Chairman Jiang Xiaomeng Directs Work in Yunnan Peak
On December 16, Jiang Xiaomeng, Secretary of the Party committee and chairman of the group company, went to Yunnan Jianfeng cement company to investigate and guide the work. On the morning of the same day, accompanied by the Yunnan peak management team, Jiang Xiaomeng went deep into the front line and successively went to the central control room of the production and manufacturing department, the raw material clay yard, the lignite yard and other areas for field investigation and investigation to understand the problems existing in the production and operation process. Subsequently, a business analysis meeting was held to make a comparative analysis of the various business indicators of Yunnan Jianfeng from January to November this year, and put forward two requirements to the management team: further strengthen internal management and improve execution; strengthen the coordination of external relations, and improve The ability and level of enterprise resource acquisition. At the Yunnan Jianfeng middle-level cadre meeting held on the afternoon of the 16th, Jiang Xiaomeng first fully affirmed Yunnan Jianfeng's highest output and best benefits since it was put into production in 2018, and expressed his gratitude to all cadres and employees of Yunnan Jianfeng for their hard work. After that, Jiang Xiaomeng made a detailed analysis of the cement industry and the regional market environment in Yunnan, and combined with the current production and operation situation of Yunnan Jianfeng, put forward the focus of the next step: 1. should fully attach importance to and mobilize the initiative and responsibility of employees at all levels to improve the overall execution of the team; 2. raw material mines are an important factor restricting the future development of cement enterprises, which should be paid full attention to and formulate clear strategies and methods, set out a timetable to obtain future production resources as much as possible; 3. continuously advocate and promote technological innovation, keep pace with the times, continuously improve production management, equipment management, production technology level, and maintain the competitive advantage of the industry; 4. further strengthen production
2020
07-31